Lesco to Achieve 100% Smart Meter Coverage by 2029

Lesco plans to shift 6.7 million electricity connections in the Lahore region to advanced metering infrastructure (AMI) by 2029, aiming to eliminate overbilling and improve efficiency. The project includes installing smart meters for domestic, commercial, and industrial connections, with 60,000 already replaced and more underway. Lesco Smart Meter Rollout. Backed by an Asian Development Bank grant, Lesco is expediting installations and addressing meter shortages. Additionally, two new customer service centres in Lahore will provide streamlined services like bill corrections and payment plans, with trained staff ensuring quality support.

اپنا لیسکو ڈپلیکیٹ بل چیک کریں۔

Lesco to Achieve 100% Smart Meter Coverage by 2029

Smart Metering Rollout Plan

By 2029, Lesco wants to use Advanced Metering Infrastructure (AMI) for 6.7 million connections in Lahore. Starting July 2024, all new three-phase domestic connections will use smart meters. Over 60,000 meters have already been replaced, with 56,000 more planned soon. The project builds on a 2018 pilot program and targets phased implementation to ensure minimal disruption. The AMI system promises accurate, real-time readings, eliminating overbilling and improving energy management.

Key Benefits of AMI Meter

Accurate and Real-Time Meter Readings

  • Enables hourly or half-hourly readings instead of monthly estimates.  
  • Provides consumers with greater transparency and control over energy usage.  

Efficient Billing Process 

  • Automatic data transfer to the control room ensures accurate and timely billing.  
  • Reduces delays and errors associated with manual meter readings.

Elimination of Overbilling and Tampering

  • Minimizes corruption and billing disputes by ending manual reading practices.  
  • Ensures precise readings, preventing tampering or manipulation of meters.  

Enhanced Consumer Convenience

  • Allows consumers to monitor their usage in real-time for better energy management.  
  • Simplifies the billing process, improving overall customer satisfaction. 

Operational Efficiency for Lesco

  • Streamlines meter reading and billing operations.  
  • Enables daily monitoring of energy distribution for better system oversight.  

Customer Service Modernization

Lesco is modernizing its customer service by establishing two new Customer Service Centers in Lahore, located in the Second and Fifth Circles. These centres, set to be inaugurated this month, will offer a range of services, including bill corrections, instalment plans, and extensions on due dates. With trained staff adhering to international standards, the centres aim to provide convenient, efficient support, reducing the need for residents to travel to Lesco’s headquarters. This initiative reflects Lesco’s commitment to improving customer experience and accessibility.

Support from Development Partners

Lesco’s Smart Meter Rollout is backed by Development Partners particularly the Asian Development Bank (ADB) which provides:

Financial Assistance:

ADB grants help expedite meter installations and address shortages.

Technical Support:

Expertise in system design, implementation, and operational efficiency.

Capacity Building:

Training and knowledge-sharing to enhance Lesco’s workforce.

Policy and Advisory:

Guidance on best practices and regulatory alignment for smooth project execution.

Conclusion

Lesco intends to replace 6.7 million conventional meters in Lahore with smart meters by 2029, thanks to support from the Asian Development Bank. Lesco Smart Meter Rollout. Energy management will be enhanced, accurate real-time readings will be ensured, and overbilling will be prevented by moving to Advanced Metering Infrastructure (AMI). Another component of the initiative is updating customer service centres to provide more effective assistance.

FAQ’s:

1. What is the Lesco Smart Meter Rollout Project?

By 2029, Lahore will have Progressed Metering Foundation (AMI). The venture’s targets are to increment functional proficiency, destroy overbilling, and improve charging precision.

2. How will the rollout impact consumers?

Clients will profit from constant energy checking, more exact and convenient invoicing, and more command over how much power they use. Also, there will be less possibility of overbilling and meter altering.

3. Is Lesco receiving external support for this project?  

Yes, Lesco is receiving financial backing and technical assistance from the Asian Development Bank (ADB)which has provided 131,000 smart meters and will help ensure smooth implementation.

4. Will there be any disruptions during the installation? 

Lesco plans a phased installation to minimize disruptions. Most work will be done gradually over several years to ensure smooth implementation.

5. Will there be new customer service centres? 

Yes, Lesco is opening two new Customer Service Centers in Lahore to assist consumers with billing corrections, payment plans, and other services. These centres are set to be inaugurated soon.

Scroll to Top